Дизайн: МЭРИ Э. РОЗ


48-inch wingspan, 22-inch drop
Valley Yarns Charlemont, 60% Superwash merino/20% Mulberry Silk, 20% Polyamide 100 gms[3.53 oz] 439 yds [401 meters] 2 skeins, shown in Teal Blue.
Thanks to Webs for sponsoring the yarn for this design!
Size US 5 (3.75 mm): 40 inch [100 cm] circular needles.
Stitch markers
smooth waste yarn for provisional cast on
T-pins and optional blocking wires for blocking.
20 sts and 24 rows =4inches [10cm] after blocking
Please see our standard abbreviations.
click to enlarge
click to enlarge
click to enlarge
click to enlarge
click to enlarge
Tab CO: Provisionally CO 3 sts and work 13 rows of garter stitch, turn work 90 degrees and pick up and p 6 sts, then pick up the 3 sts from your provisional cast on; 12 sts.
Row 1 (RS): K3, *k1, yo repeat from* to last 4 sts, k4; 17 sts.
Row 2 (WS): K3, p to last 3 sts, k3.
Row 3: K across.
Row 4: K3, *p1, yo, repeat from * to last 4 sts, p1, k3; 27 sts
Row 5: K across.
Row 6: K3, p to last 3 sts, k3.
Row 7: K3, *k1, yo, cdd, yo, repeat from * to last 4 sts, k4; no change in st cnt.
Row 8: K3, p to last 3 sts, k3.
Row 9: K3, *k1, yo, repeat from* to last 4 sts, k4; 47 sts.
Row 10: K3, p to last 3 sts, k3.
Rows 11-18: Work Chart A rows 11-14 two times. (pattern repeat is 4 sts)
Row 19: K3, *k1, yo repeat from* to last 4 sts, k4; 87 sts.
Row 20: K3, p to last 3 sts, k3.
Rows 21-36: Work Chart B two times. (pattern repeat is 16 sts)
Row 37: K 3, *k1, yo repeat from* to last 4 sts, k4; 167 sts.
Row 38: K3, p to last 3 sts, k3.
Rows 39 -70: Work Chart C two times. (pattern repeat is 16 sts)
Row 71: K3, *k1, yo repeat from* to last 4 sts, k4; 327 sts.
Row 72: K3, p to last 3 sts, k3.
Rows 73-104: Work Chart D two times. (pattern repeat is 32 sts)
Rows 105-136: Work Chart E one time, then proceed to finishing instructions. (pattern repeat is 32 sts)
Bind off as follows: Knit 2, return both stitches to the left hand needle and knit 2 together through the back loops, *knit 1, return two stitches from right hand needle to left hand needle and knit two together through back loops; repeat from * until all sts have been worked. Pull end through final stitch and cut yarn, leaving a 9 inch tail for weaving in. Weave in ends.
Blocking:
Soak piece in lukewarm water for at least 30 minutes. Using blocking wires, if desired across the top (flat)edge, stretch and use t-pins to pull out the final “water droplets”. Once dry, clip ends.
http://knotions.com/issues/december-2017/pattern-d...17/hike-to-marion-falls-shawl/