Хорошая схема, где показаны с убавления на макушке. Руководствуясь ею можно также связать берет.
[500x338]
[640x640]
[584x640]
[640x480]
One size
FINISHED MEASUREMENTS
10” in diameter
Knit Picks City Tweed DK [55% Merino Wool, 25% Superfine Alpaca, 20% Donegal Tweed; 123 yds/112m per 50g ball]; 2 balls
(Photos shown color “Orca”)
1 set(s) 3.75mm double-point needles
NOTIONS
Stitch marker, Tapestry needle, Cable knitting needle (cn)
40 sts/28 rows = 10 cm pattern of chart, 22 sts/28 rows = 10 cm stockinette stitch
The pattern is worked by following chart. The stitches on chart represent 1/10 total number of sts.
When cable sts are worked over the stitch marker on the end/beg, work with the last sts and the beg sts in the next rnd in order to complete the cable sts.
CO 80 sts, place a stitch marker and join in round, being careful not to twist.
Next rnd: [K2, p2] rep until end.
Rep this rnd until 1.75” measurement from beg.
Next rnd: Kfb rep until end – 160 sts in total.
Next rnd: [K1, kfb] rep until end – 240 sts in total.
Next: Work rnds 1-45 of chart. See chart.
Rnd 1: [C8F (sl 4 sts onto cn, hold in front, k4, k4 from cn)] rep until end.
Rnd 2-4: Work in St st.
Rnd 5: K4, [C8B (sl 4 sts onto cn, hold in back, k4, k4 from cn)] rep until last 4 sts, C8B with the last 4 sts and the next 4 sts.
Rnd 6: Work rem sts in St st.
Rnd 7-8: Work in St st.
Rnd 9-15: Rep rnd 1-7.
Rnd 16: [K2tog, k2] rep until end.
Rnd 17: [C6F (sl 3 sts onto cn, hold in front, k3, k3 from cn)] rep until end.
Rnd 18-20: Work in St st.
Rnd 21: K3, [C6B (sl 3 sts onto cn, hold in back, k3, k3 from cn)] rep until last 3 sts, C6B with the last 3 sts and the next 3 sts.
Rnd 22: Work rem sts in St st.
Rnd 23-24: Work in St st.
Rnd 25-26: Rep rnd 17-18.
Rnd 27: [K2tog, k1] rep until end.
Rnd 28: K2, [C4B (sl 2 sts onto cn, hold in back, k2, k2 from cn)] rep until last 2 sts, C4B with the last 2 sts and the next 2 sts.
Rnd 29: Work rem sts in St st.
Rnd 30: Work in St st.
Rnd 31: [C4F (sl 2 sts onto cn, hold in front, k2, k2 from cn)] rep until end.
Rnd 32-33: Work in St st.
Rnd 34-37: Rep rnd 28-31.
Rnd 38: [K2tog] rep until end.
Rnd 39: K1, [C2B (sl 1 st onto cn, hold in back, k1, k1 from cn)] rep until last 1 st, C2B with the last 1 st and the next 1 st.
Rnd 40: Work rem sts in St st.
Rnd 41: [C2F (sl 1 st onto cn, hold in front, k1, k1 from cn)] rep until end.
Rnd 42: Work in St st.
Rbd 43-45: Rep rnd 39-41.
Next rnd: K2tog rep until end – 30 sts in total.
Next rnd: K2tog rep until end – 15 sts in total.
Next: Break yarn, leaving about 5”. Draw through rem sts and pull yarn through center to inside.