• Авторизация


Шапка плетенка. 15-03-2015 07:18 к комментариям - к полной версии - понравилось!

Это цитата сообщения ALISA_80 Оригинальное сообщение

Шапка-плетенка Тabby Tam by Asami Kawa, The Fibertarian, Winter 2009

Хорошая схема, где показаны с убавления на макушке. Руководствуясь ею  можно также связать берет.

[640x480]

[500x338] [640x640] [584x640] [640x480]

SIZE

One size

 

FINISHED MEASUREMENTS
10” in diameter

 

MATERIALS

Knit Picks City Tweed DK [55% Merino Wool, 25% Superfine Alpaca, 20% Donegal Tweed; 123 yds/112m per 50g ball]; 2 balls

(Photos shown color “Orca”)

 

1 set(s) 3.75mm double-point needles

 

NOTIONS

Stitch marker, Tapestry needle, Cable knitting needle (cn)

 

GAUGE

40 sts/28 rows = 10 cm pattern of chart, 22 sts/28 rows = 10 cm stockinette stitch

 

PATTERN NOTES

The pattern is worked by following chart. The stitches on chart represent 1/10 total number of sts.

When cable sts are worked over the stitch marker on the end/beg, work with the last sts and the beg sts in the next rnd in order to complete the cable sts.

 

PATTERN

CO 80 sts, place a stitch marker and join in round, being careful not to twist.

Next rnd: [K2, p2] rep until end.

Rep this rnd until 1.75” measurement from beg.

 

Next rnd: Kfb rep until end – 160 sts in total.

Next rnd: [K1, kfb] rep until end – 240 sts in total.

 

Next: Work rnds 1-45 of chart. See chart.

     Rnd 1: [C8F (sl 4 sts onto cn, hold in front, k4, k4 from cn)] rep until end.

     Rnd 2-4: Work in St st.

     Rnd 5: K4, [C8B (sl 4 sts onto cn, hold in back, k4, k4 from cn)] rep until last 4        sts, C8B with the last 4 sts and the next 4 sts.

     Rnd 6: Work rem sts in St st.

     Rnd 7-8: Work in St st.

     Rnd 9-15: Rep rnd 1-7.

     Rnd 16: [K2tog, k2] rep until end.

     Rnd 17: [C6F (sl 3 sts onto cn, hold in front, k3, k3 from cn)] rep until end.

     Rnd 18-20: Work in St st.

     Rnd 21: K3, [C6B (sl 3 sts onto cn, hold in back, k3, k3 from cn)] rep until last 3 sts, C6B with the last 3 sts and the next 3 sts.

     Rnd 22: Work rem sts in St st.

     Rnd 23-24: Work in St st.

     Rnd 25-26: Rep rnd 17-18.

     Rnd 27: [K2tog, k1] rep until end.

     Rnd 28: K2, [C4B (sl 2 sts onto cn, hold in back, k2, k2 from cn)] rep until last 2 sts, C4B with the last 2 sts and the next 2 sts.

     Rnd 29: Work rem sts in St st.

     Rnd 30: Work in St st.

     Rnd 31: [C4F (sl 2 sts onto cn, hold in front, k2, k2 from cn)] rep until end.

     Rnd 32-33: Work in St st.

     Rnd 34-37: Rep rnd 28-31.

     Rnd 38: [K2tog] rep until end.

     Rnd 39: K1, [C2B (sl 1 st onto cn, hold in back, k1, k1 from cn)] rep until last 1 st, C2B with the last 1 st and the next 1 st.

     Rnd 40: Work rem sts in St st.

     Rnd 41: [C2F (sl 1 st onto cn, hold in front, k1, k1 from cn)] rep until end.

     Rnd 42: Work in St st.

     Rbd 43-45: Rep rnd 39-41.

 

Next rnd: K2tog rep until end – 30 sts in total.

Next rnd: K2tog rep until end – 15 sts in total.

 Next: Break yarn, leaving about 5”. Draw through rem sts and pull yarn through center to inside.

 

 

FINISHING

Weave in all ends and block it if needed. Make a length of 2” in diameter pompom and sew it on the top.

[360x573]

[390x354]

вверх^ к полной версии понравилось! в evernote


Вы сейчас не можете прокомментировать это сообщение.

Дневник Шапка плетенка. | nattally - Дневник nattally | Лента друзей nattally / Полная версия Добавить в друзья Страницы: раньше»